Featured Industrial Process
national steel union electric big river zinc


A.O. Smith
Clayco provided ongoing service to this metal fabrication plant, including pipefitter, millwright and ironworker services.
  A.O. Smith

B.O.C. Air Separation Plant
This $7 million project involved the grassroots construction of an oxygen plant for British Oxygen Corporation to provide purified gasses to a local refinery client.
  B.O.C. Air Separation Plant

Big River Zinc
Clayco performed ongoing work at Big River Zinc, including retrofits, outage maintenance and repair, and new capital projects.
  Big River Zinc

Chrysler Corporation
Demolition, site preparation and relocation of body shop welding machines, as well as installation of new welding equipment and conveyor systems.
  Chrysler Corporation

Chrysler Corporation
Installation of paint sludge filtration system including structure, pumps, piping and platforms.
  Chrysler Corporation

Ford Motor Company
$8 million Project involving modifications to the paint department.
  Ford Motor Company

Ford Motor Company
Paint shop spray booth intallation -Three (3) new booths complete with all fans and ventilation ductwork.
  Ford Motor Company

General Motors
$4.6 million Chassis and final conveyor line installation for new model line.
  General Motors

General Motors
$1.5 million project to install new concrete pits and containment area of paint shop.
  General Motors

General Motors
Overhead monorail relocation. Relocation of 1500 feet of monorail for engine delivery system.
  General Motors

General Motors
$3.5 million Chassis inverted power and free conveyor system.
  General Motors

General Motors Corporation
Modifications and renovation of training center, including power distribution, HVAC modifications and shop.
  General Motors Corporation

International Technology
Clayco was prime contractor on the installation of a thermal treatment unit used to burn contaminated waste materials.
  International Technology

Monsanto
Clayco provided a crew at this chemical plant location, providing a variety of piping, millwright and ironworker services for capital projects as well as in-plant maintenance, repair and replacement projects.
  Monsanto

National Starch
This $3 million project involved extensive vessel setting and design-build process piping, on a very fast track basis, for a new process at this existing facility.
  National Starch

National Steel
This $4 million project involved setting and alignment of equipment for the Continuous Caster used to manufacture cargon steel plate.
  National Steel

Nordyne Co.
$10 million project included equipment removal, relocation, and re-commissioning necessitated from the flood of 1993. Minimal downtime was accomplished during this fast track project.
  Nordyne Co.

P.Q. Corporation
$5 million grassroots processing plant and equipment installation for new D-300 Gel production
  P.Q. Corporation

Procter & Gamble Manufacturing and Distribution Facility
Construction is underway on a new paper goods manufacturing and distribution plant in Brigham City, Utah, for The Procter & Gamble Company.
  Procter & Gamble Manufacturing and Distribution Facility

Save-A-Lot Ltd.- Williamsports
Clayco completed construction on a 32,000-square-foot freezer expansion at Save-A-Lot’s Williamsport facility in October 2006.
  Save-A-Lot Ltd.- Williamsports

Shell Oil Company
Clayco recently completed a series of capital projects for Shell Oil, including vessel setting, steel erection, piping and machinery alignment.
  Shell Oil Company

Toray Carbon Fibers America
Clayco completed the design and construction of a 270,000-square-foot manufacturing facility for Toray Carbon Fibers America who is the main supplier for Carbon Fiber Panels to Boeing for the 787 Dreamliner.
  Toray Carbon Fibers America

Union Electric Company
$6 million coal material handling upgrade project, consisting of rebuild and renovation of all coal material handling equipment on a fast track schedule.
  Union Electric Company

Union Electric Company, Meramec
Clayco completed the $5.3 million coal handling upgrade project for Union Electric.
  Union Electric Company, Meramec

United States Postal Service Greenville Processing Plant
Clayco Inc. was recently named design-builder for the United States Postal Service’s first two LEED® Certified buildings.
  United States Postal Service Greenville Processing Plant

United States Postal Service Palatine Processing Plant
Clayco Inc. is renovating the United States Postal Service’s mail processing and distribution center (P&DC) in Palatine, Ill., and design-building a 55,095-square-foot addition.<
  United States Postal Service Palatine Processing Plant

United States Postal Service Royal Oak Processing Plant
Clayco Inc. was recently named design-builder for the United States Postal Service’s first two LEED® Certified buildings.
  United States Postal Service Royal Oak Processing Plant


* Represents a Forum Studio Project | Visit Forum