left_grad.gif
  
  • Business Group Leader
  • Dave Moses
    Executive Vice President
  • 2199 Innerbelt Business Center Dr.
    St.Louis, MO 63114
  • Phone: 314-429-5100
    Email:

Biography

Moses obtained a Bachelor of Science degree in Civil Engineering in 1978 from the University of Missouri – Columbia.

In 1990, Moses joined Clayco and serves as the Business Unit Leader for the Industrial Logistics Division and is responsible for business development, contract negotiation, real estate coordination, project leadership design oversight and strategic planning.

Featured Logistics /Distribution
GAP jordans furniture payless


Business Unit Definition:
Consistently rated at the top on Engineering News-Record's annual ranking of builders of warehouse and distribution facilities, Clayco understands how to help analyze, design and construct distribution centers that are efficient operational structures, ranging from refrigerated food facilities to consumer products and pharmaceutical warehouses.

Mission Statement:
To be the leading provider of "fully integrated" logistics and real estate solutions for clients who understand our value.


255 Logistics Center
Clayco and Balke Brown Associates have completed the 255 Logistics Center - Building One in Sauget, Ill.
  255 Logistics Center

3M Midwest Distribution Center
Clayco has completed construction on a 90,670-square-foot distribution center for 3M in the Park 88 development in Dekalb.
  3M Midwest Distribution Center

Aeroterm and MLR Air Cargo Facility
Clayco design-built the new 164,000-square-foot air cargo facility at George Bush Intercontinental Airport for Aeroterm and MLR Management Inc.
  Aeroterm and MLR Air Cargo Facility

Alton Center Business Park
Abandoned in 1993, the 153-acre former Owens-Illinois Glass Bottle Plant site has been transformed into a mixed-use development with an estimated completion value between $80 and $100 million.
  Alton Center Business Park

Amscan
In September 2001, Clayco completed a 50-acre distribution/warehouse for Amscan, “The Party People.” The facility is used to sort, pack and ship the company’s selection of party products.
  Amscan

Anixter Inc.
Clayco completed Anixter's 457,701-square-foot distribution facility using green building technology.
  Anixter Inc.

Ashley Capital
Clayco completed a 150,000-square-foot, metal-frame speculative warehouse/distribution facility for Ashley Capital designed for companies with distribution and warehousing needs in the northern Chicago suburbs or southern Milwaukee area.
  Ashley Capital

Associated Material Handling
Clayco is constructing an 85,000-square-foot distribution/office/manufacturing facility for Associated Material Handling in Northeastern Illinois.
  Associated Material Handling

AutoZone Distribution Center
In the summer of 2004, Clayco completed a 592,311-square-foot distribution facility in Terrell, Texas, for AutoZone. Developed by The Walker Companies of Atlanta, the project was built on an aggressive timeframe, with partial occupancy scheduled for just 168 days after the start of construction. The facility is located in the Airport Industrial Park, a business park owned by the Terrell Economic Development Corp.
  AutoZone Distribution Center

Avatar Corporation
Clayco completed construction in early 2006 on a warehouse and office expansion for Avatar Corporation in southwest suburban Chicago.
  Avatar Corporation

Barjan Products, L.P.
Pain/Wetzel ONCOR International selected Clayco to build a 240,000-square-foot building for Barjan Products, L.P., which was consolidating operations from three different facilities.
  Barjan Products, L.P.

Bayer Corp. Shawnee Distribution Center
Clayco teamed up with Springfield, MO-based Killian Construction Co. and completed Bayer Corp.'s 247,320 square-foot distribution center in Shawnee Mission, Kan.
  Bayer Corp. Shawnee Distribution Center

Boise Business Solutions
In March 2007, Clayco completed a 90,000-square-foot distribution center for Boise Building Solutions. Located in the Santa Rosa Industrial Park, the new structure features 10,000 square feet of office space.
  Boise Business Solutions

Borden Pasta Plant
This $9 million project included installation of all process equipment for pasta production at Borden's new pasta plant.
  Borden Pasta Plant

Budco Corporate Headquarters
Clayco completed Budco`s award-winning 362,000-square-foot world headquarters in 2000.
  Budco Corporate Headquarters

Buske Lines, Inc. - Expansion
Clayco has completed two warehouse facilities for Buske Lines in Gateway Commerce Center, bringing the company`s Metro East warehouse space to nearly 800,000 square feet.
  Buske Lines, Inc. - Expansion

Buske Lines, Inc./National Wine and Spirits of Michigan
Despite harsh winter conditions, Clayco completed a 301,600-square-foot regional distribution center for Buske Lines, Inc. and National Wine and Spirits of Michigan, Inc. in only 110 days.
  Buske Lines, Inc./National Wine and Spirits of Michigan

*Caterpillar - Clayton Distribution Center
Clayco was recently selected as design/builder of a nearly 1.5 million SF storage and assembly facility for Caterpillar, Inc.
  Caterpillar - Clayton Distribution Center

Children's Place/Disney Store
Clayco has completed a 728,410-square-foot distribution facility for The Children’s Place and Disney Store in DeKalb County, Ala.
  Children's Place/Disney Store

Chrysler/The Fodale Group
Clayco increased Chrysler's distribution space in this project for The Fodale Group.
  Chrysler/The Fodale Group

Coldwater Creek
In September 2006, Clayco completed a 385,000-square-foot expansion of a distribution center for Coldwater Creek, a national retailer of women’s apparel, jewelry, gifts and accessories
  Coldwater Creek

*Coleman Distribution Center
Clayco Inc. is constructing a new 1,107,000-square-foot distribution facility for Coleman.
  Coleman Distribution Center

Contico
Contico International, Inc. is one of the nation's leading makers of plastic containers and specialty store products.
  Contico

Continental
Clayco completed a 318,000 sq. ft. new facility in Earth City, Missouri for Continental, a subsidiary of Contico, and one year later added an additional 227,500 sq. ft. expansion, for a total of 545,000 sq. ft.
  Continental

Covington Center LLC - RPS
This speculative warehouse/distribution center built for First Industrial Realty Trust and RPS as the first and main tenant was finished over a 6 month design and construction period.
  Covington Center LLC - RPS

Crown Enterprises
In December 2005, Clayco completed its second design-build project in Detroit's I-94 Industrial Park.
  Crown Enterprises

Dick's Clothing and Sporting Goods
Clayco constructed a new distribution facility for Dick`s Clothing and Sporting Goods in the I-70 Industrial Park in Smithton, Penn. The 1999 project consisted of onsite improvements and new construction of a 388,190-square-foot office/warehouse building.
  Dick's Clothing and Sporting Goods

Disney Direct Marketing Distribution Center
1997 marked the completion of Clayco.s first distribution center for Disney Direct Marketing Inc. The 660,000-square-foot facility sits on a 95-acre site within Southpoint Distribution Park in Memphis, Tenn.
  Disney Direct Marketing Distribution Center

Disney Direct Marketing Distribution Center
This single-story, 519,000-square-foot facility includes 24,000 square feet of Class A office space and a 495,000-square-foot warehouse with state-of-the-art material handling and automated sorting technology.
  Disney Direct Marketing Distribution Center

DM Management
To meet a fast-track deadline on DM Management's 407,000-square-foot office/warehouse, Clayco used innovative heating techniques to create suitable conditions for the pouring of tilt-up concrete wall panels throughout the winter months.
  DM Management

eToy's Inc.
Clayco completed a 716,000-square-foot warehouse addition for the former online retailer eToys Inc. to help meet demands for 2000 holiday sales. Construction began in March 2000 and was completed in October 2000.
  eToy's Inc.

*Experitec
Clayco began construction in June 2002 on a $3 million headquarters for Munger Co., Inc. in Chesterfield, Mo., and completed the project in December 2002, less than six months after breaking ground.
  Experitec

Famous Footwear
Clayco Inc. is design-building Famous Footwear’s new 300,000-square-foot distribution center.
  Famous Footwear

FedEx
Clayco completed construction of an $8.9 million FedEx distribution center for Jones Development Co. in June 2007.
  FedEx

First Industrial Realty Trust
Clayco completed a 302,832-square-foot speculative warehouse on a 20-acre industrial park for First Industrial Realty Trust Inc. in the fall of 2006.
  First Industrial Realty Trust

Flexi-Mat Corporation
Clayco Construction Company began construction of a 150,000-square-foot corporate headquarters facility for Flexi-Mat, the market leader in the pet bedding industry, August 2003. The project is the first building to be constructed in the new Crossroad Business Center.
  Flexi-Mat Corporation

GAP/Old Navy Distribution Center
The Gap turned to Clayco to construct its 1.5 million-square-foot warehouse/distribution facility for The Gap/Old Navy.
  GAP/Old Navy Distribution Center

Health Care Services Corporation
Clayco recently completed a 138,000-square-foot warehouse space for Health Care Service Corporation.
  Health Care Services Corporation

HEB Meat Plant
Clayco renovated a 110,00-square-foot meat plant for HEB Grocery, including second floor offices, break room and testing facility.
  HEB Meat Plant

Hewlett-Packard Supplies After Market (HPSAM)
Developed by Panattoni Development Co., the $18 million East Coast distribution hub for Hewlett-Packard Supplies includes two buildings totaling 640,000 square feet.
  Hewlett-Packard Supplies After Market (HPSAM)

Holten Meat, Inc.
Clayco design-built a technologically advanced food processing and distribution center for Holten Meat in Sauget Business Park in Sauget, Ill.
  Holten Meat, Inc.

*Home Decorators Collection
Clayco provided design-build services for Home Decorators Collection`s 300,000-square-foot national distribution center in Mexico, Mo.
  Home Decorators Collection

*Hyundai Motor America
Clayco provided turnkey design-build delivery for Hyundai Motor America`s 351,000-square-foot distribution and training center in Prime Aurora Business Park, meeting critical delivery dates.
  Hyundai Motor America

I-170 Distribution Center
The 153,000-square-foot expansion includes 88,000 square feet of refrigerated space. Temperature controlled zones include a 13,000-square-foot freezer, a 70,000-square-foot cooler and 12 docks maintaining a temperature of 35 F.
  I-170 Distribution Center

International Trade Center Flex Building
Clayco design-built a $4.5 million, 101,400-square-foot office/flex space building in the International Trade Center in Mount Olive, N.J.
  International Trade Center Flex Building

JDI Group, Inc.
This office/distribution facility was completed in July, 1995. The building is located in Earth City, Missouri. The design by Mitchell Hugeback Architects provides 18,000 sq. ft. of finished office area with approximately 10,000 sq. ft. available for expansion on a 2nd floor.
  JDI Group, Inc.

*Jordan`s Furniture
In late 2002, Clayco Construction Company began design-build of Jordan`s Furniture`s new one-of-a-kind corporate headquarters and warehouse complex in Taunton, Mass.
  Jordan`s Furniture

*Kraft Foods Inc.
Clayco completed design-build of an 864,873-square-foot distribution facility for Kraft Foods Inc. in Aurora, Ill., in early 2003.
  Kraft Foods Inc.

Longs Drug Stores Corporation
Clayco finished construction in summer 2006 on an 800,000-square-foot distribution facility for Longs Drug Stores.
  Longs Drug Stores Corporation

Mary Kay®
Clayco completed this $7.8 million warehouse and distribution center operation for Mary Kay Inc., one of the largest direct sellers of skin care and color cosmetics in the world. The 134,905-square-foot building was completed by the end of 2005.

  Mary Kay®

McKesson Drug Company
Soon after beginning work on Best Buy`s Livonia, Mich., distribution center, Clayco was selected to design-build McKesson Drug Company`s 150,000-square-foot distribution center on the adjacent property.
  McKesson Drug Company

Metro Truck & Trailer
Completed in June 2005, this truck maintenance facility is designed to facilitate truck repair and provide a comfortable place for drivers.
  Metro Truck & Trailer

Neuman Distributors, Inc.
In 1998, Clayco completed its first project in the New Jersey market - a 332,000-square-foot distribution center for The Morris Companies, leased to pharmaceutical company Neuman Distributors, Inc.
  Neuman Distributors, Inc.

Nicolson, Porter & List, Inc.
In September 2002, Clayco completed a 108,000-square-foot speculative office/warehouse for Nicolson, Porter & List Inc. (NPL).
  Nicolson, Porter & List, Inc.

North Broadway Distribution Center
Clayco completed construction of a 420,000-square-foot speculative warehouse in downtown St. Louis.
  North Broadway Distribution Center

O & W, Inc.
In spring 2003, Clayco completed design-build of a new corporate headquarters for O & W, Inc. that nearly doubled the company`s space.
  O & W, Inc.

Office Depot
Clayco completed Office Depot`s 262,000-square-foot warehouse in under 100 days.
  Office Depot

OfficeMax - Garden Grove
Clayco completed renovation for OfficeMax's 261,250-square-foot regional distribution center in Garden Grove, Cailf., in August 2005.
  OfficeMax - Garden Grove

OfficeMax - Indianapolis
In 2000, Clayco completed an 84,000-square-foot distribution center for OfficeMax Office Products in Indianapolis -its 10th project for the company.
  OfficeMax - Indianapolis

OfficeMax - Norman
Clayco completed the addition of 10,400 square feet of office space to an existing OfficeMax sales center
  OfficeMax - Norman

Oxford Keystone Commerce Center
In March 1999, Clayco completed the 180,000-square-foot Keystone Commerce Center office/warehouse facility for Oxford Development Co.
  Oxford Keystone Commerce Center

Packaging Concepts, Inc.
Clayco completed design-build on a $5.8 million, 131,000-square-foot manufacturing, distribution and office facility for the flexographic printer.
  Packaging Concepts, Inc.

Park 370
Clayco completed construction on a 75,000-square-foot speculative building located in the new Park 370 Tech Center.
  Park 370

Payless ShoeSource Inc.
Clayco Inc. completed construction on a 800,000-square-foot distribution facility in Brookville, Ohio for Payless ShoeSource Inc.
  Payless ShoeSource Inc.

Pearson Education
Clayco completed this nearly 890,000-square-foot distribution center, which includes 58,000 square feet of office space, 465,000 square feet of high-bay, narrow-aisle rack storage space, and approximately 365,000 square feet of air-conditioned process/shipping space.
  Pearson Education

Pepsi Cola
Clayco served as a single source for Pepsi-Cola Co.`s St. Louis production and bottling facility, providing complete turnkey services for the construction and equipment installation at the facility.
  Pepsi Cola

Pepsi Cola - Indiana Expansion
$1.5 million upgrade of existing soft drink can line to increased line speed, reliability, and flexibility in packaging, completed on a fast track basis within the confines of the existing operating plant.
  Pepsi Cola - Indiana Expansion

Plochman Mustard Co.
Chicago-based mustard manufacturer Plochman, Inc.'s $4.7 million plant was one of the first in the Chicago area to use tilt-up concrete construction.
  Plochman Mustard Co.

Premier Rentals
Clayco completed a warehouse and office facility for Premier Rentals, an event rental company located in St. Louis County, Mo.
  Premier Rentals

Prime Group Realty Trust
Clayco completed a 257,600-square-foot distribution facility for Prime Group Realty Trust, a real estate investment trust (REIT). The facility, completed in 2000, is located in the 186-acre Prime Aurora Business Park in Aurora, Ill.
  Prime Group Realty Trust

Procter & Gamble
Following the successful completion of a Procter & Gamble facility at Gateway Commerce Center in Madison, Ill., Clayco also built in 2001 a 502,082-square-foot P&G distribution center in Cape Girardeau, Mo. The facility is a distribution center for P&G paper towel and paper tissue products.
  Procter & Gamble

*Procter & Gamble - Gateway Commerce Center
Gateway Commerce Center is the new home for three consolidated operations of Procter & Gamble. The massive 806,400-square-foot distribution facility for the consumer-products manufacturer at eh Madison County, Illinois business park will be one of the largest distribution facilities in the St. Louis area.
  Procter & Gamble - Gateway Commerce Center

Proctor & Gamble
Working together on a third project, Clayco and Procter & Gamble joined forces to expand the P&G West Branch distribution center.
  Proctor & Gamble

ProLogis
In early 2006, Clayco completed construction on a distribution center for ProLogis in suburban Chicago.
  ProLogis

ProLogis
ProLogis selected Clayco in 1998 to build its first new development in the St. Louis area. Located in Earth City, Mo., the 170,000-square-foot distribution facility was built to accommodate multi-tenant or single occupancy and is divisible to a minimum of 25,500 square feet.
  ProLogis

ProLogis
Clayco completed construction on the second of two distribution centers for ProLogis in suburban Chicago in early 2006.
  ProLogis

Rockefeller Group Development Corp. Distribution Center
Clayco has completed construction on a 680,747-square-foot warehouse and distribution center for Rockefeller Group Development Corp.
  Rockefeller Group Development Corp. Distribution Center

RTS
Clayco was asked by First Industrial Realty Trust to provide RTS with a facility where they could store and distribute engines to General Motors.
  RTS

Schmalbach-Lubeca
Clayco completed a 487,900-square-foot manufacturing and distribution plant for tenant Schmalbach-Lubeca, a maker of plastic containers.
  Schmalbach-Lubeca

Sears Logistics Services, Inc.
Clayco completed a $7.7 million expansion of Sears Logistics, Inc.'s distribution center in Diversitech Industrial Park in Manteno, Ill. The 300,000-square-foot expansion increased the total size of the facility to 1.3 million square feet.
  Sears Logistics Services, Inc.

Serta Mattress Company
Clayco completed design-build o a 232,000-square-foot manufacturing facility for Serta Mattress Company.
  Serta Mattress Company

Solo Cup
Clayco completed a 1.3 million-square-foot warehouse and distribution center for Solo Cup.
  Solo Cup

*Southern Wine & Spirits of America, Inc.
Clayco began construction in February 2005 on a 600,000-square-foot distribution facility for Southern Wine & Spirits of Florida.
  Southern Wine & Spirits of America, Inc.

SouthSouthern Wine & Spirits – Artesian
Clayco Inc. is in the process of renovating Southern Wine & Spirits’ Chicago distribution center.
  SouthSouthern Wine & Spirits – Artesian

Sunmark Companies
Clayco provided a new 18,000-square-foot facility for the manufacturing and distribution of over-the-counter candy products for Sunmark Companies.
  Sunmark Companies

Sysco Detroit, LLC Expansion
Clayco Inc. was recently named design-builder on a 71,000-square-foot freezer and cold dock expansion project in Canton, Mich., for Sysco Detroit, LLC.
  Sysco Detroit, LLC Expansion

Tenneco Packaging
Tenneco Packaging's 813,000-square-foot warehouse/distribution facility was one of Clayco's first projects in the Texas market.
  Tenneco Packaging

The Tyson Companies
Clayco completed a 570,000-square-foot warehouse/distribution facility for The Tyson Companies, consolidating the conglomerate's Midwest regional warehouse operations.
  The Tyson Companies

Touch of Class Catalog
The concrete panel tilt-up building for Touch of Class features over 6,500 square feet of glass at the entrance and exterior offices of the call center.
  Touch of Class Catalog

Trade Center III, V and VIII
The three Trade Center projects illustrate the diversity of the multi-tenant spec office/warehouse market in the Earth City Industrial Park Complex.
  Trade Center III, V and VIII

Trane Corp.
Clayco completed a 250,000-square-foot distribution facility with 20,000 square feet of attached Class A office space for Trane Corp.
  Trane Corp.

Trolley II
First Industrial Realty Trust and Clayco created a design-build speculative office/warehouse/distribution facility with the flexibility to provide for four feasible tenants.
  Trolley II

United States Postal Service Greenville Processing Plant
Clayco Inc. was recently named design-builder for the United States Postal Service’s first two LEED® Certified buildings.
  United States Postal Service Greenville Processing Plant

United States Postal Service Palatine Processing Plant
Clayco Inc. is renovating the United States Postal Service’s mail processing and distribution center (P&DC) in Palatine, Ill., and design-building a 55,095-square-foot addition.<
  United States Postal Service Palatine Processing Plant

United States Postal Service Royal Oak Processing Plant
Clayco Inc. was recently named design-builder for the United States Postal Service’s first two LEED® Certified buildings.
  United States Postal Service Royal Oak Processing Plant

USAA Real Estate Co.
Clayco recently completed design-build work for USAA Real Estate Co., building out tenant space for Solo Cup at its University Park, Ill., facility.
  USAA Real Estate Co.

Villa Lighting
Clayco is design-building a 222,573-square-foot office/warehouse structure for Villa Lighting.
  Villa Lighting

Whirlpool Distribution Facility
Clayco provided complete design-build, turnkey services to Whirlpool for its 556,000-square-foot St. Louis distribution facility. FYI - For some reason, there is a duplicate Sears Logistics entry at the bottom of the Distribution page without a link. Please delete this as the entry is already listed above.
  Whirlpool Distribution Facility

Young Innovations
Clayco has completed a 98,000-square-foot distribution center and office structure for Young Innovations Inc. in Algonquin, Ill.
  Young Innovations



* Represents a Forum Studio Project | Visit Forum b_top.gif

content_sub_bottom.gif

Copyright © 2008 Clayco  |  Contact Clayco  |  About Clayco  |  Clayco Office Locations |  Site Map  |  E-mail Login |  FTP |  Remote Connect |  Webex  
right_grad.gif
bottom.gif