Clayco has completed design-building a 24,000-square-foot new main office and branch facility for High Desert Federal Credit Union in southern California. The two-story tilt-up structure features two drive-up lanes with two-way audio-visual links. The drive-up lanes were constructed to accommodate two additional lanes. Forum Studio Inc. completed the interior finish for the project.
Head-on drive-up lane configuration
Emergency generator on-site for critical functions