Project Description
Clayco was selected to build the new regional distribution center near Bessemer, Ala., that serves more than 1,100 Dollar General Stores. The $56 million project included the construction of nearly 1 million square feet of warehouse and office space, a truck maintenance facility, two guard houses and a pedestrian walkway bridge connecting employee parking to the main building. The project was on a fast-track schedule and was completed in one year. More than 2 million square feet of concrete paving surrounds the distribution center to accommodate employees and semi-truck fleet. The construction process was sequenced to protect the shrinkage compensating concrete floors. Heating and cooling systems utilize ammonia, gycol and water piped throughout the building.
var _gaq = _gaq || []; _gaq.push(['_setAccount', 'UA-11175733-1]); _gaq.push(['_trackPageview']);
(function() { var ga = document.createElement('script'); ga.type = 'text/javascript'; ga.async = true; ga.src = ('https:' == document.location.protocol ? 'https://ssl' : 'http://www') + '.google-analytics.com/ga.js'; var s = document.getElementsByTagName('script')[0]; s.parentNode.insertBefore(ga, s); })();